Manufacturing
A look inside the SHUOKANG factory, and how a style moves from development to dispatch.

From brief to dispatch
Briefs, references and drawings are turned into a buildable style with your input.
Samples are made and reviewed with you until the style is approved.
Approved styles move onto the production line, from stitching through assembly.
Checkpoints agreed per project are carried out during and after production.
Finished pairs are packed to your brief and prepared for shipment.
Inside the factory




Quality and inspection
Inspection points are discussed per project and carried out against the sample you approve.
The sample you review and approve becomes the reference for production.
Materials and components are checked against the approved sample before production begins.
Work is reviewed at key stages of production so issues surface early.
Finished pairs are reviewed against the approved sample before they are packed.
Tell us the category, estimated quantity and branding needs. We will reply by email.